Water Proofing for Bathrooms
Technical specification of xypofin 2k method of waterproofing for bathroom & wall treatment :
Firstly, we recommend you to clear the surface of bathroom & wall and prepare the rough surface for waterproofing.
Then, we prepare the xypofin 2k coating and apply on the surface as first coat on all the parts.
After the coating of xypofin , we will do sandwitching of surface by fabric roll on the regular surfaces and corners blocked by black tarpin fabric roll on all corners and agin repeated for the second coat of xypofin on the surface making the second protective surface of waterproofing. Than we do the 3rd coat of safety coat i.e blue tarpin coat and finally we do coating of black polymer tarpin membrane coat on all corners and pipe blockage to make the process total complete and effective.
Finally, the surface is allowed for drying for atleast 1 day and then we make water testing of wall and floor. A pipeline pressure checking is also conducted.Now the waterproofing process will be complete and surface is ready for laying tiles.
Water Proofing for Bathrooms | Waterproofing for Terrace
|
|